Further verification of the 3-D model results will be obtained by test loading of the Tobin Bridge once the sensors and monitors are installed. The test loading will consist of positioning fully loaded trucks along the bridge and recording the results. The test must be conducted when no other vehicle loading is on the portion of the span that is being tested. This will require that both decks of the Tobin Bridge be closed to traffic for a short period of time.
The results of the test loading will help Massport engineers verify that the 3-D models are correctly predicting forces within the Tobin Bridge’s members and components. Once the verification process is complete, the models can then reliably be used to identify critical information points for sensor and monitor placement. These areas will include locations where elevated stress levels or unexpected deflections have been observed.
At this writing, the initial 3-D models of the Tobin Bridge are still in development. Therefore, all key locations for sensor and monitor placement have not yet been finalized along with total project cost.
No comments:
Post a Comment